LM130 Vertical Coal Mill in Vietnam

Project location: Vietnam

Equipment: LM130M complete system

Input material: Bituminous coal

Yield: 15t/h

Date of put into production: October 2015

 

Customer information

The customer is a well-known non-metallic ore supplier in Vietnam, which is very popular, and was very cautious from the selection of the manufacturer to the project negotiation. After on-site investigation, ZENITH won the trust of customers with its strong brand and scale advantages, and finally the two sides reached the cooperation.

 

Project overview

The LM130M coal mill complete system are an overall production line scheme independently designed by ZENITH R&D center project team and jointly completed by professional service engineer team such as installation and debugging, according to the actual situations of local lime kiln fuel demands and project detail. In addition to the unique advantages of ZENITH LM vertical grinding mill, the general contracting service and short project cycle are more even important factors to attract customers.

 

Project advantages

1. General contracting service

General project contracting service includes on-site topographic reconnaissance and other environmental investigating, production line process designing, raw material testing, finished product requirement analysis, customer investment cost budget, equipment installation and debugging, etc. The successful implementation of Vietnam coal mill project shows that the general contracting service of ZENITH has been mature.

2. Short project cycle

The whole project only took five months from receiving the order to final completion of installation and debugging because the customer had a very urgent requirement for the project delivery. After receiving the order, ZENITH prepared production immediately, with the overtime work of workshop workers and the long distances travel to Vietnam of installation engineers, field foundation making, installing and debugging, the project was finally completed in advance in October. The short cycle relied on ZENITH’s professional and efficient management team especially a high-quality installation and after-sales department, production system, and experienced project coordination capability.

 

Production line process

First, the raw coal is sent to crusher to be crushed through charging conveyor. Then crushed raw coal is lifted by elevator to enter into distributing conveyor at the top of raw coal hopper. The crushed raw coal is fed into LM130M vertical mill by the quantitative weighing belt conveyor through the air-locking feed value.

Next, the material enters into the special explosion-proof pulsed dust collector of the vertical mill for collecting finished product coal powder after being classified by the classifier. Last, the collected finished product coal fines are conveyed by silo pump pneumatic conveying system to the storage silo or conveyed to lime shaft kiln as fuel when necessary.

Meanwhile, in order to meet the requirements of customers for safety and environmental protection, the system is equipped with pulsed dust collector to guarantee the effect of dust removing, and carbon dioxide fire extinguisher, nitrogen gas explosion protection system and explosion valve. What’s more, there is also equipped with oxygen analyzer, gas detection instruments, various sensors and other automatic control accessories, which can timely and effectively prevent from the safety accidents and guarantee the continuous running time of the equipment to maximum.

 

Brief summary

The success of the Vietnam LM130M coal mill complete system benefits from the concept of ZENITH that it always takes customers' interests as the basic starting point, in addition, ZENITH company has a powerful production and service system. The case also confirmed the strength of ZENITH that it can still keep such good sale under the tough economic situation.

More vertical mill products, please click LM vertical mill.